Maintenance Rule Reconstitution

Maintenance Rule Reconstitution

Maintenance Rule Reconstitution Pilgrim Nuclear Power Station Case Study Defined Need The Pilgrim Nuclear Power Station (PNPS) Maintenance Rule (MRule) program was not operating efficiently to ensure that there would be no unexpected failures of equipment (both...
NRC Column 4 Recovery – ANO

NRC Column 4 Recovery – ANO

Nuclear Regulatory Commission Column 4 Recovery Arkansas Nuclear One Case Study Defined Need Arkansas Nuclear One (Entergy ANO) engaged Marathon Consulting Group (MCG) to lead the project to prepare the station for a successful NRC 95003 inspection. ANO was placed in...
NRC Column 4 Recovery – Pilgrim

NRC Column 4 Recovery – Pilgrim

Nuclear Regulatory Commission Column 4 Recovery Entergy Corporation & Pilgrim Nuclear Power Station Case Study Defined Need Entergy Corporation engaged Marathon Consulting Group (MCG) to lead a project to prepare the station for a successful NRC 95003 inspection....
Mentoring for Behavior Change

Mentoring for Behavior Change

Mentoring for Behavior Change Entergy Corporation Case Study Defined Need Entergy Corporation engaged Marathon Consulting Group (MCG) to develop and lead mentoring efforts as a part of the Pilgrim Column 4 recovery. Causal analysis indicated several areas where a...