Wolf Creek
Nuclear Generating Company

Managed task activities completed in Marathon Consulting Group design office under Marathon Appendix B program. Prepared Design Change Package (DCP) and related documents for installation of platform for inspecting and servicing the Reactor Building equipment hatch lifting hoists. Task scope required the structural design, detailing and CAD drawings in accordance with Wolf Creek procedures. Design considerations included seismic and anticipated platform loadings, interaction with existing equipment and containment structure, and material limitations within Containment. Activity included draft of Regulatory Screening and USQD review.

Managed task activities completed in Marathon Consulting Group design office under Marathon Appendix B program. Task scope included preparation of Design Change Package (DCP) and related documents for platform additions below and attached to the exterior of Reactor Building Missile Shield. Task activities included conceptual and structural design, detailing and CAD drawings in accordance with Wolf Creek procedures. Design considerations included wind, seismic and anticipated platform loading.

Managed task activities completed in Marathon Consulting Group design office under Marathon Appendix B program. Prepared Design Change Package (DCP) and related documents for expansion of flooring around main steam lines at level 2068 of Containment. Special design considerations include possible steam line breaks, interference with existing equipment, and material limitations within Containment. Also required qualification of increased lateral loads within existing floor bracing system. Activity included draft of Regulatory Screening and USQD review.

Managed task activities completed in Marathon Consulting Group design office under Marathon Appendix B program. Prepared Design Change Package (DCP) and related documents for permanent installation of lead shielding storage within Containment. Task scope included seismic, fire loading and flooding considerations in accordance with Wolf Creek procedures. Activity included draft of Regulatory Screening and USQD review.

Managed task activities completed in Marathon Consulting Group design office under Marathon Appendix B program. Prepared Design Change Package (DCP) and related documents for permanent installation of scaffold storage structure in Containment. Task scope required the seismic qualification, detailing and CAD drawings in accordance with Wolf Creek procedures. Special considerations included fire loading and material limitations within Containment. Activity included draft of Regulatory Screening and USQD review.

Also Providing Services for:

  • Mechanical Engineering Support
  • Post Modification Testing
  • Nuclear Licensing Support
  • Operations Procedure Writing
  • Technical Support
  • Reactor Engineering

 

| Core Competencies | Key Client Personnel | Clients & Projects | Home |


 

© 2001 - 2018 Marathon Consulting Group, Inc. All Rights Reserved
1002 Abbey Court, Alpharetta, GA 30004 
 Phone 678-879-8700   Fax 678-879-8701